Showing posts with label electrical. Show all posts
Showing posts with label electrical. Show all posts

Saturday, March 15, 2008

Speakers 2

Speakers 2


Another set of speakers here. I really like building speakers, I can't help it. I built them pretty much the same way as these. This set of speakers are a 3-way setup with an active crossover, and they're red!

Time: 1 month

Level of Difficulty: (What's with the saws?)

Saturday, February 9, 2008

Bathroom Rebuild 2

Bathroom Rebuild


Bathroom Rebuild 2



Months have gone by now and we are still working on the bathroom. We've been making lots of progress which you can see in the photos. We've been posting so many pictures that we went over the 500 photo limit in the first album. A second album named Bathroom Rebuild 2 has been created. Check it out.

Time: 1/2 year

Cost: O

Witch-gear: Purchases to make this project easier: Table saw, Tile saw, Paint sprayer

Level of Difficulty: (What's with the saws?)

What I Learned: Plan Ahead.

SpokePOV

SpokePOV


Project: I finally put together a present from my sister. Lots of soldering.

Witch-gear: Solder station

Time: 3 hours

What I learned: Soldering station are really nice. If you have to solder lots of connections, a solder station is definitely the way to go.



Level of Difficulty: (What's with the saws?)

Monday, November 26, 2007

Bathroom Remodel

Bathroom Rebuild

First came the dripping down in the laundry room when anyone took a shower upstairs--which Bob always blamed on everyone--Kate in particular--not closing the shower door properly. So on it dripped. Then came the dark spots in the hardwood floors in the front hall where water was wicking in from the bathroom wall. Then came the repeated black stains on the shower tiles and the squishy spot in the floor by the tub. It was definitely time for bathroom repairs. And why go halfway when you can strip something down to the studs? This will be LONG project...stay tuned.

Time: many, many hours over an indeterminate span of time.....?

Cost: One arm, one leg...perhaps a firstborn...

Witch-gear: All of it, and perhaps some "necessary" new purchases?

Level of Difficulty: (What's with the saws?)

What I Learned: So far...that old tile and backer board is very heavy and hard to dispose of. That things always take MUCH longer than you anticipated they would. That you should plan BEFORE you start as some things may take weeks to track down or special order.


Monday, November 5, 2007

Battery Pack Rebuild

Battery Pack Rebuild 2 Photos


This Milwaukee cordless driver was at one time a very handy tool. When the battery pack lost its charge it wasn't as useful. New battery packs tend to be expensive and hard to find so I cracked this one open and put in a few new cells.

Time: 0.5 hours

Cost: $2.69 for two new 2600 mAH NiCd batteries

Witch-gear: 30W soldering iron

Level of Difficulty: (What's with the saws?)

Friday, October 12, 2007

Shed Fix Up

Shed Fix Up - Photos

Fixing up the shed in the back of Mom and Dad's house. Building shelves to hold 24 Rubbermaid Roughnecks (432 total gallons of junk storage!) Also, fixing the broken switch for the light fixture and adding another light on the far end of the shed.

Time: 3 hours

Cost: N/A

Equipment/Tools Used: Craftsman Chop Saw. Craftsman Circular Saw, 2 Dewalt Cordless Drills

Level of Difficulty: (What's with the saws?)

Thursday, March 1, 2007

Drill Battery

Drill Battery Photos

I love the Dewalt XRP drills. I don't like that after 4 years the battery goes dead really fast and that the replacement batteries are $70. I bought some new cells and replaced them myself. They're not pretty, but neither is the drill after 4 years of abuse.

Time: 2 hours

Cost: $30 for new cells. Enough for 2 battery packs.

Equipment/Tools Used: Soldering Iron, screwdrivers

Level of Difficulty: (What's with the saws?)

Thursday, December 28, 2006

Room Rebuild

Room Rebuild Photos

Oh no, mold! After looking behind the wall and discovering mold in this room, we had to rebuild a large portion of this room. The drywall was removed and after sealing the bricks with waterproof cement and paint, we replaced some framing and put in new drywall, electrical outlets, lights, ceiling fan, ceiling tiles, and flooring. It's like a brand new room!

Time: 1 week

Cost: $1500

Equipment/Tools Used: RotoZip (new tool!), drill, hammers,... you name it!

Level of Difficulty: (What's with the saws?)

Thursday, June 8, 2006

Speakers

Speakers Photos


I wanted to do something that I thought Bob and Steph would both enjoy for a wedding present. They both like music... sooooo speakers. After researching different styles of speakers and different drivers, I decided to go with a design that was relatively compact, but also had a great range of frequencies. The cabinet for the speakers took a long time to figure out how to build and paint. The finish took two tries, but It turned out nice and shiny. The crossover was simple to assemble. They sound great too!

Time: 2 months

Equipment/Tools Used: Table saw, Router, drill, screwdriver, soldering iron, sandpaper

Level of Difficulty: (What's with the saws?)