Showing posts with label plumbing. Show all posts
Showing posts with label plumbing. Show all posts

Saturday, February 9, 2008

Bathroom Rebuild 2

Bathroom Rebuild


Bathroom Rebuild 2



Months have gone by now and we are still working on the bathroom. We've been making lots of progress which you can see in the photos. We've been posting so many pictures that we went over the 500 photo limit in the first album. A second album named Bathroom Rebuild 2 has been created. Check it out.

Time: 1/2 year

Cost: O

Witch-gear: Purchases to make this project easier: Table saw, Tile saw, Paint sprayer

Level of Difficulty: (What's with the saws?)

What I Learned: Plan Ahead.

Friday, December 7, 2007

Monday, November 26, 2007

Bathroom Remodel

Bathroom Rebuild

First came the dripping down in the laundry room when anyone took a shower upstairs--which Bob always blamed on everyone--Kate in particular--not closing the shower door properly. So on it dripped. Then came the dark spots in the hardwood floors in the front hall where water was wicking in from the bathroom wall. Then came the repeated black stains on the shower tiles and the squishy spot in the floor by the tub. It was definitely time for bathroom repairs. And why go halfway when you can strip something down to the studs? This will be LONG project...stay tuned.

Time: many, many hours over an indeterminate span of time.....?

Cost: One arm, one leg...perhaps a firstborn...

Witch-gear: All of it, and perhaps some "necessary" new purchases?

Level of Difficulty: (What's with the saws?)

What I Learned: So far...that old tile and backer board is very heavy and hard to dispose of. That things always take MUCH longer than you anticipated they would. That you should plan BEFORE you start as some things may take weeks to track down or special order.