http://www.flickr.com/photos/brynnb/sets/72157614041613323/
If we suddenly hit the Powerball jackpot my first act (well, after helping my kids erase their student loans) would be to hire a tribe of artisans to work on every aspect of my house. I’d want everything stain-glassed, wood-worked and ceramitized. But since we do not have the wherewithal to become patrons of the arts, we must make do.
The celestory windows over the closet in our bedroom have been a source of irritation for a long time. We’d gotten into the terrible habit of parking junk up there (suitcases, the big bowls from Bob and Steph’s wedding we didn’t know what to do with, Bob’s hatboxes, a Rubbermaid tub or two of off-season clothes). It looked junky from the inside, and even worse, you could see it from outside when our lights were on.
I decided to do a faux stained glass treatment.
Bob cut me four pieces of Plexi-glass the exact size of the panes of glass (or as we like to say in the Witchger household “more-or-less” the size of the panes).
I drew up a pattern–an homage to Frank Lloyd Wright–and marked each section as to whether I wanted it clear, textured or milky-white.
Leaving the plexi-glass on the pattern I first cut away the protective plastic in the areas I wanted frosted and peeled it off, using the remaining plastic as a masque and spray painted those with aerosol stained-glass paint. When that had dried I pulled off the rest of the protective plastic and “drew” on the fake leading which I’d purchased in plastic squeeze bottles and let that dry overnight.
The next day I filled in each secton according to the opacity I’d assigned it and let it dry for 48 hours.
Bob then installed the panes right over the old glass using glazing points. When we get tired of them we can just take them down. But right now I like how they look, especially when the sun streams in late in the afternoon. I think this will be the motivation we need to keep the junk from gathering up there again. Now the only question is where do we put it all if Kate needs to use her old room again?
Lessons learned:
This can’t be rushed--a fan pushes the stained glass paint to one side so that you get a leeward effect.
The paint needs to dry absolutely flat-it has a high viscosity, but after hours it will run and if you don’t catch it in time it will overrun the “leading”.
Supplies:
Thin Plexi-glass
Fake “leading” for stained glass from the craft store
Stained glass “paint” in clear and frosted
Elmer’s glue (the cheaper the better, I used three bottles that were 25¢ each during the back-to-school sales) for the white milky sections.
Glazing points
A screwdriver for pushing the glazing points into the molding
Showing posts with label home improvement. Show all posts
Showing posts with label home improvement. Show all posts
Wednesday, February 18, 2009
Happy Windows
Posted by
The Witchgers
at
10:45 PM
1 comments
Labels: crafting, home improvement
Tuesday, September 16, 2008
Thursday, July 3, 2008
Living Room Shades
![]() |
| Living Room Shades |
New shades for the living room. Oak flooring was cut, glued and clamped into blocks to mounts these on.
Time: 2 hours
Witch-gear: Table saw, drill, countersink
Level of Difficulty:
(What's with the saws?)What We Learned: Cheap oak flooring is awesome. It has lots of uses and doesn't look bad.
Posted by
The Witchgers
at
12:56 AM
0
comments
Labels: carpentry, home improvement
Room Bebuild #2
![]() |
| Room Rebuild 2 |
Here is another room that we "rebuilt." It's my brother's old room and has now been converted into a guest room. While we didn't take the room down to the studs like the first Room Rebuild, replacing the ceiling, the lights, the floor and painting made this room look a lot better.
Time: 3 weekends
Cost: $500
Level of Difficulty:
(What's with the saws?)What I Learned: 4 - T-8 bulb light fixtures are bright!, drop ceilings make a room feel like an office.
Posted by
The Witchgers
at
12:38 AM
0
comments
Labels: home improvement
Saturday, February 9, 2008
Bathroom Rebuild 2
![]() |
| Bathroom Rebuild |
![]() |
| Bathroom Rebuild 2 |
Months have gone by now and we are still working on the bathroom. We've been making lots of progress which you can see in the photos. We've been posting so many pictures that we went over the 500 photo limit in the first album. A second album named Bathroom Rebuild 2 has been created. Check it out.
Time: 1/2 year
Cost: O
Witch-gear: Purchases to make this project easier: Table saw, Tile saw, Paint sprayer
Level of Difficulty:
(What's with the saws?)What I Learned: Plan Ahead.
Posted by
Kevin
at
2:25 AM
0
comments
Labels: carpentry, electrical, home improvement, plumbing
Monday, November 26, 2007
Bathroom Remodel
![]() |
| Bathroom Rebuild |
First came the dripping down in the laundry room when anyone took a shower upstairs--which Bob always blamed on everyone--Kate in particular--not closing the shower door properly. So on it dripped. Then came the dark spots in the hardwood floors in the front hall where water was wicking in from the bathroom wall. Then came the repeated black stains on the shower tiles and the squishy spot in the floor by the tub. It was definitely time for bathroom repairs. And why go halfway when you can strip something down to the studs? This will be LONG project...stay tuned.
Time: many, many hours over an indeterminate span of time.....?
Cost: One arm, one leg...perhaps a firstborn...
Witch-gear: All of it, and perhaps some "necessary" new purchases?
Level of Difficulty:
(What's with the saws?)What I Learned: So far...that old tile and backer board is very heavy and hard to dispose of. That things always take MUCH longer than you anticipated they would. That you should plan BEFORE you start as some things may take weeks to track down or special order.
Posted by
Kevin
at
4:55 PM
1 comments
Labels: carpentry, electrical, home improvement, plumbing
Tuesday, October 30, 2007
New Shop Light
![]() |
| New Shop Light |
Dad and I put up a new shop light to replace an old noisey one in Mom's study. The new one is nice and quiet.
Time: 0.5 hours
Cost: ~$30 at Lowes
Witch-gear: Drill
Level of Difficulty:
(What's with the saws?)What We Learned: T8 Bulbs are smaller, brighter, and quieter than the regular size T12 Bulbs.
Posted by
Kevin
at
12:29 PM
0
comments
Labels: home improvement
Thursday, December 28, 2006
Room Rebuild
![]() |
| Room Rebuild Photos |
Oh no, mold! After looking behind the wall and discovering mold in this room, we had to rebuild a large portion of this room. The drywall was removed and after sealing the bricks with waterproof cement and paint, we replaced some framing and put in new drywall, electrical outlets, lights, ceiling fan, ceiling tiles, and flooring. It's like a brand new room!
Time: 1 week
Cost: $1500
Equipment/Tools Used: RotoZip (new tool!), drill, hammers,... you name it!
Level of Difficulty:
(What's with the saws?)
Posted by
Kevin
at
4:14 PM
0
comments
Labels: carpentry, electrical, home improvement
Subscribe to:
Posts (Atom)





